[1]
Moran, T.J. and Brayer, K. 2011. A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Annual Setup Cost As Performance Metric. International Journal of Management & Information Systems (IJMIS). 15, 2 (Mar. 2011), 23–30. DOI:https://doi.org/10.19030/ijmis.v15i2.4149.