Moran, T. J., & Brayer, K. (2011). A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Annual Setup Cost As Performance Metric. International Journal of Management & Information Systems (IJMIS), 15(2), 23–30. https://doi.org/10.19030/ijmis.v15i2.4149