[1]
T. J. Moran and K. Brayer, “A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Annual Setup Cost As Performance Metric”, IJMIS, vol. 15, no. 2, pp. 23–30, Mar. 2011.