Moran, T. J., and K. Brayer. “A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Annual Setup Cost As Performance Metric”. International Journal of Management & Information Systems (IJMIS), vol. 15, no. 2, Mar. 2011, pp. 23-30, doi:10.19030/ijmis.v15i2.4149.