[1]
Sherrard, W.R., McEwen, M. and Williamson, J.E. 1997. Activity-Based Costing: Multiple Lot Size Effect. Journal of Applied Business Research (JABR). 13, 2 (Apr. 1997), 103–108. DOI:https://doi.org/10.19030/jabr.v13i2.5765.