[1]
Tippins, M. and Stroh, L.K. 1993. The 4/4 Work Schedule: Impact On Employee Productivity And Work Attitudes In A Continuous Operation Industry. Journal of Applied Business Research (JABR). 9, 3 (Jul. 1993), 136–145. DOI:https://doi.org/10.19030/jabr.v9i3.6054.