[1]
Moran, T.J. and Troutt, M. 2009. A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Completion Time As Performance Metric. Journal of Business & Economics Research (JBER). 7, 10 (Oct. 2009). DOI:https://doi.org/10.19030/jber.v7i10.2339.