[1]
Moran, T.J. and Stevens, J. 2012. A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Average Work In Process (WIP) Inventory Cost As Performance Metric. Journal of Business & Economics Research (JBER). 10, 4 (Mar. 2012), 217–224. DOI:https://doi.org/10.19030/jber.v10i4.6897.