Moran, T. J., & Troutt, M. (2009). A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Completion Time As Performance Metric. Journal of Business & Economics Research (JBER), 7(10). https://doi.org/10.19030/jber.v7i10.2339