Moran, T. J. and Troutt, M. (2009) “A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Completion Time As Performance Metric”, Journal of Business & Economics Research (JBER), 7(10). doi: 10.19030/jber.v7i10.2339.