Moran, T. J. and Stevens, J. (2012) “A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Average Work In Process (WIP) Inventory Cost As Performance Metric”, Journal of Business & Economics Research (JBER), 10(4), pp. 217–224. doi: 10.19030/jber.v10i4.6897.