[1]
T. J. Moran and J. Stevens, “A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Average Work In Process (WIP) Inventory Cost As Performance Metric”, JBER, vol. 10, no. 4, pp. 217–224, Mar. 2012.