Moran, T. J., and M. Troutt. “A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Completion Time As Performance Metric”. Journal of Business & Economics Research (JBER), vol. 7, no. 10, Oct. 2009, doi:10.19030/jber.v7i10.2339.